
Charging Connector / 50a / Lite / W/long Lead / Clamp / Ev
Price: 100.00 INR / Unit
(100.00 INR + 0% GST)
Get Latest Price
MRP:
100.00 INR / Piece
Weight :
500.00 Gram
1 Pack Contains :
10
Minimum Pack Size :
10
In Stock
Product Specifications
Voltage | 50 Ampere (amp) |
Used For | Electric Vehicle |
Connector Type | Charging Connector |
Vehicle Model | Electric Vehicle |
Product Type | EV Charging Connector |
Color | Black |
Payment Terms | Cash Advance (CA), Cheque, Telegraphic Transfer (T/T), Cash in Advance (CID) |
Supply Ability | 1000 Per Week |
Delivery Time | 1 Week |
Sample Policy | Contact us for information regarding our sample policy |
Packaging Details | PACK OF 10 PCS Carton Box |
Main Domestic Market | All India |
Stock Quantity | 1000 |
Pkg Box Length | 10.00 cm |
MRP | 100.00 INR |
Packsize | 10 |
Unit Type | Piece/Pieces |
Shipping Type | actual |
Currency | INR |
Color | Black |
Price Type | fixed |
Brand Name | WG INDIA |
Pkg Box Breadth | 10.00 cm |
Pkg Box Height | 10.00 cm |
Returnable | No |
Price | 100.00 INR (Approx.) |
Weight | 500.00 Gram |
Mop | 10 |
Minimum Ordered Packs | 10 |
GSTIN | 0% |
Product Overview
Key Features
Key Features :-
50 Ampere Capacity: Handles a high current for efficient charging.
Lightweight & Compact: Easy to handle and ideal for home use.
Extended Long Lead: Provides a longer reach for flexible charging.
Secure Clamp Connection: Ensures a strong, reliable terminal grip.
EV Charging Ready: Designed specifically for electric vehicles.
High-Power Throughput: Delivers power efficiently to the battery.
Construction: Built for reliability and a long lifespan.
Application: The clamp is compatible with various terminals.
Easy to Handle: The light design simplifies daily use.
Flexible Charging: Allows for convenient parking and setup.
Company Details
Focusing on a customer-centric approach, HARMAN TRADERS has a pan-India presence and caters to a huge consumer base throughout the country. Buy Automobile Electrical Spares in bulk from HARMAN TRADERS at Trade India quality-assured products.
Business Type
Manufacturer, Distributor, Supplier, Trading Company, Wholesaler, Retailer, Dealer
Employee Count
3
Establishment
2014
Working Days
Monday To Sunday
GST NO
07AIXPS7019Q1Z1
Related Products
Explore Related Categories
More Product From This seller
Seller Details
GST - 07AIXPS7019Q1Z1
New Delhi, Delhi
Manager
Mr. Sunpreet Singh
Address
H. No. 14/44, 3rd Floor, Subhash Nagar New Delhi, Delhi, 110002, India
Report incorrect details