voice search
Overburden Drilling Bits

Overburden Drilling Bits

Price:

Get Latest Price

In Stock

In Stock

Product Specifications

ComplianceAPI 7-1
Cutting StructureTricone
Diameter Range2-6 inches
FeaturesHigh durability, Various sizes, Efficient drilling, Reliable performance, Cost-effective
MaterialHigh-speed steel
Thread TypeAPI Reg.
UsageOverburden drilling applications, removing loose material above bedrock
Weight Range5-25 kg

Product Overview

Key Features

These high quality Over Overburden Drilling Bits are made by using very high quality raw material which ensures high durability at its user end. These Overburden Drilling Bits are widely available in various specifications and dimensions.

Company Details

Established in 2003, Changsha Enyu Engineering Equipments Co., Ltd. has made a name for itself in the list of top suppliers of Machine Tools Accessories in India. The supplier company is located in Changsha, Hunan, and is one of the leading sellers of listed products.
Changsha Enyu Engineering Equipments Co., Ltd. is listed in Trade India's list of verified sellers offering supreme quality of Button Bits, Diamond Core Bit, Down The Hole Bits, etc. Buy Machine Tools Accessories in bulk from us for the best quality products and service.

Business Type

Exporter, Manufacturer

Employee Count

15

Establishment

2003

Working Days

To

Related Products

Explore Related Categories

More Products From This Seller

Seller Details

Changsha, Hunan

Name

Ms. Ling Bo

Address

Room 706, HONGFEI Building, No.123 Yanshan Street, Changsha, Hunan, 410000, China

Report incorrect details

Compare With Similar Products

Usage

Hole Drilling in Metal

To Create Holes in Materials Such as Metal, Wood, Plastic, or Concrete During Drilling Operations

Size

Standard

600ml

Product Type

Drill Bits

Drill Bits

Color

Chrome

Silver

Payment Terms

Others, Telegraphic Transfer (T/T)

Cash in Advance (CID), Cheque, Telegraphic Transfer (T/T)

Supply Ability

As per requirement Per Month

7500 Per Week

Delivery Time

2-3 Week

1 Week

Packaging Details

As required

As per the Industrial Standard

People Also Viewed