voice search
Coal Based Power Plants

Coal Based Power Plants

Price:

Get Latest Price

In Stock

In Stock

Product Specifications

Boiler MaterialHigh-Grade Steel
CapacityUp To 10 Mw
Control SystemAutomated
Cooling SystemCondenser
FeaturesHigh Efficiency, Reliable Power, Cost Effective, Scalable Design, Sustainable Energy, Reduced Emissions, Easy Operation
Fuel TypeCoal
Steam PressureHigh Pressure
Turbine TypeCondensing Steam Turbine

Product Overview

Key Features

We offer to our clients a highly efficient range of Coal Based Power Plants. The fuels, such as Indian coal and imported coal are burnt in boiler to generate steam at high pressure. The steam generated, is then superheated to remove moisture and then passed through a condensing steam turbine. The steam that comes out of the turbine is passed through a condenser that creates a negative gauge pressure in the turbine, so that maximum output is extracted. The condensate coming out of the condenser is pumped back to the boiler circuit by condensate evacuation pumps.

Technical specifications of our range are mentioned below:
* Capacity: up to 10 MW
* Working pressure: imported coal / Indian coal / lignite

Company Details

Registered in 2015, DAACK VESSELS PVT. LTD. has made a name for itself in the list of top suppliers of Plant & Machinery in India. The supplier company is located in Bengaluru, Karnataka, and is one of the leading sellers of listed products.
DAACK VESSELS PVT. LTD. is listed in Trade India's list of verified sellers offering supreme quality of Coal Based Power Plants, Waste Heat Recovery Based Power Plants, etc. Buy Plant & Machinery in bulk from us for the best quality products and service.

Business Type

Exporter, Manufacturer, Supplier

GST NO

29AADCD3030B1ZA

Related Products

Explore Related Categories

More Products From This Seller

Seller Details

GST

GST - 29AADCD3030B1ZA

Bengaluru, Karnataka

Managing Director

Mr. Shivanand Shetty

Address

#21/3A, Swaraj building, MES Ring Road, Muthyalnagar, Bengaluru, Karnataka, 560054, India

power plants in Bengaluru

Report incorrect details

Compare With Similar Products

Type

Heavy Duty Power Plant

PVA Emulsion Plant

Payment Terms

Cash Advance (CA), Cash in Advance (CID), Cheque

Cash on Delivery (COD), Days after Acceptance (DA), Cash Against Delivery (CAD), Cash in Advance (CID), Cheque, Cash Advance (CA)

Delivery Time

1 Months

10-20 Days

Sample Policy

Contact us for information regarding our sample policy

Contact us for information regarding our sample policy

Main Domestic Market

All India

All India

People Also Viewed