voice search
Round Cooling Tower - Frp Vertical Induced Draft Design | Efficient Air Flow, Energy-saving Performance

Round Cooling Tower - Frp Vertical Induced Draft Design | Efficient Air Flow, Energy-saving Performance

Get Latest Price

In Stock

In Stock

Product Specifications

materialFRP
designCounter flow
draftInduced
shapeRound
installationAny direction
air resistanceLess
typeVertical
FeaturesEven Distribution, Less Power, Energy Saving, Easy Installation, Thermodynamically Efficient

Product Overview

Key Features

These Round Cooling Towers (FRP) are vertical induced draft counter flow design permits installation in any direction with freedom. Being Round shape the air flow through the ower is more evenly distributed. Structural members do not interrupt air intake and therefore they have been proven to be thermodynamicaly the most efficient design in the field. Our Round Cooling Towers consumes less power (Energy) because of less air resistance to water, saving in Round type cooling towers.

Company Details

Win Equipments, based in Coimbatore, Tamil Nadu, is a trusted manufacturer and supplier of industrial cooling and compressed air solutions. We offer Cooling Towers, Chillers, Refrigeration & Desiccant Air Dryers, Compressed Air Filters, Air Receivers, Aftercoolers, Automatic Drain Valves, and Coil Cooling Systems. Our products are known for reliable performance, energy efficiency, and durable construction, serving diverse industries across India.

Business Type

Exporter, Manufacturer, Supplier

Employee Count

18

Establishment

2008

Working Days

Monday To Sunday

GST NO

33AJWPA2797B1Z7

Payment Mode

Cash Advance (CA), Others

Related Products

Explore Related Categories

More Products From This Seller

Seller Details

GST

GST - 33AJWPA2797B1Z7

Palladam, Tamil Nadu

Director

Mr. Anantha Kumar

Address

SF No: 4, 195 B, Post, Kallangadu, Arasur Palladam, Tamil Nadu, 641407, India

Report incorrect details

Compare With Similar Products

Condition

New

New

Type

Electric 1000 Liters Capacity Cooling Tower For Industrial Use

Counter Flow Cooling Tower

Payment Terms

Cash on Delivery (COD), Cash Against Delivery (CAD), Cash Advance (CA)

Others, Telegraphic Transfer (T/T), Cash in Advance (CID), Cheque, Cash Advance (CA)

Delivery Time

4-10 Days

1-2 Months

Main Domestic Market

All India

All India

People Also Viewed