voice search
Plastic Nozzle Mould - Steel Material, 3d Modeled Design With Advanced Hot Runner System | Independent Temperature Control & Heating In Each Cavity

Plastic Nozzle Mould - Steel Material, 3d Modeled Design With Advanced Hot Runner System | Independent Temperature Control & Heating In Each Cavity

Price:

Get Latest Price

In Stock

In Stock

Product Specifications

CavityIndependent
ControlTemperature
Features3D modeling, Hot runner, CNC equipments, Temperature control
HeatingSystem
MaterialSteel
PartsCNC
Software3D modeling
SystemHot runner

Product Overview

Key Features

These Plastic Nozzle Mould is designed with 3D modeling software. The mould is designed by advanced hot runner system and each cavity has independent temperature control &heating system. All of the parts are manufactured with CNC equipments. Steel material to use is according to clienta s request.

Company Details

Established in 2001, DONGGUAN,JUNYI HARDWARE&PLASTIC CO. LTD. has made a name for itself in the list of top service providers of Moulds in India. DONGGUAN,JUNYI HARDWARE&PLASTIC CO. LTD. is listed in Trade India's list of verified companies offering a wide array of Electronic Key Mould, Electronic Tester Plastic Mould, Lighting Accessories Mould, etc. Contact here for Moulds in Dongguan, Guangdong.

Business Type

Exporter, Manufacturer, Service Provider, Supplier

Establishment

2001

Related Products

Explore Related Categories

More Products From This Seller

Seller Details

Dongguan, Guangdong

Name

Mr. Jack Zhang

Address

SHUAN ROAD, SHUTIAN PRECINT, HUMEN TOWN, Dongguan, Guangdong, 523000, China

roto moulding plastic moulds in Dongguan

Report incorrect details

Compare With Similar Products

Buyer Feedback

3

Color

Grey

Customized

Payment Terms

Others, Cash on Delivery (COD), Cash Against Delivery (CAD), Cash in Advance (CID), Cheque, Cash Advance (CA)

Letter of Credit at Sight (Sight L/C), Telegraphic Transfer (T/T), Others, Letter of Credit (L/C)

Supply Ability

All india Per Day

15 Per Day

Delivery Time

5-10 Days

45 Days