voice search
Factories Pre Engineered Building

Factories Pre Engineered Building

Price:

Get Latest Price

In Stock

In Stock

Product Specifications

Design TimeReduced
Erection CostCompetitive
Fabrication Time6-8 Weeks
FeaturesFast Installation, Economical, Durable, Flexible, Strong, Aesthetic, Sustainable
FoundationSimple Design
Primary FramingTapered Sections
Secondary MembersRoll-Formed
Structure WeightLightweight Steel

Product Overview

Key Features

Factories Pre Engineered Building (PEB) made available by us is designed and developed by us using advanced technology and a predetermined inventory of raw materials. Further, fabricating methods employed by us can efficiently satisfy a vast spectrum of structural and elegant design requirements. By using computer aided designing, we can create unique prefabricated structures for our clients. Our Factories Pre Engineered Building consists a structural steel framework of primary and secondary members (rigid frame, purlins and girts). On to the steel framework, cladding and roofing components are attached.

Applications:

  • Warehouses

  • Factories

  • Cold Stores

  • Schools, Offices, Hospitals, Site Offices

  • Bus Shelters, Gas Stations, Car Parks

  • Shopping Malls, Commercial Complexes

  • Aircraft Hangars

  • Sports and other recreational facilities

  • Metro/Railway Stations

Advantages:
  • Economical

  • Faster installation

  • Aesthetic Appeal

  • Flexibility in Expansion

  • Durable & Strength

  • Lower life cycle costs for greater return on investment

  • Virtually unlimited design flexibility

  • Compelling sustainability attributes

Technical specifications:


Structure Weight

Pre- Engineered Buildings are on the average 30% lighter through the efficient use of steel. Primary framing members are tapered (varying depth) built- up sections, with large depths in the areas of highest stress.

Secondary members are light gage (light weight) roll- formed (low labour cost)"Z or "C" shaped members.

Design

Quick and efficient; since PEBs are mainly formed of standard sections and connections, design time is significantly reduced. Basic design, based on international design standards and codes, are used over and over.

Specialized computer analysis and design programs optimize material required. Drafting is also computerized using standard details that minimize the use of project custom details.

Design, shop detail sketches and erection drawings are supplied free of charge by the manufacturer.

PEB engineers design and details pre-engineered buildings almost every day throughout the year resulting in faster and more efficient designs.

Consultant's in-house design and drafting time is considerably reduced, allowing more time for co-ordination and review and reduction in design fees.

Fabrication Time

Average 6 to 8 Weeks.

Erection Cost And Time

Both costs and time of erection are accurately known based upon extensive experience with similar buildings.

PEBs are often erected by specialized PEB builders with extensive experience in the erection of similar buildings, offering very competitive rates. PEB builders usually have a stock of standard components; enabling them to complete jobs on time should any shortage or site damage occur to materials.

The erection process is easy, fast, step by step and with hardly any requirement for equipment.

Foundation

Simple design, easy to construct and light weight.

Erection Simplicity

Since the connections of the components are standard, the learning curve of erection for each subsequent project is faster.

Periodic free of charge erection support at the site is usually provided by PEB manufacturers.

Seismic Resistance

The low-weight flexible frames offer higher resistance to seismic forces.

Overall Price

Price per square meter may be as much as 30% lower than conventional steel.

Architect

Outstanding architectural design can be achieved at low cost using standard architectural features and interface details. Traditional wall and fascia materials, such as concrete, masonry and wood, can be utilized.

Sourcing And Co-ordination

Building is supplied complete with cladding and all accessories, including erection (if desired), from a single "one stop" source.

Cost of Change Orders

PEB Manufacturers usually stock a large amount of basic raw materials that can be flexibly used in many types of PEB projects.

Change orders are easily accommodated at all stages of the order fulfillment process. Little or no material is wasted even if a change order is made after fabrication starts.

Building Accessories

Designed to fit the system with standardized and interchangeable parts, including pre designed flashing and trims. Building accessories are mass produced for economy and are available with the building.

Future Expansion

ll project records are safely and orderly kept in electronic format indefinitely, making it easy for the owner or designer to obtain a copy of his building records at any time.

Future expansion is simple, easy and cost effective. One supplier can coordinate changes.

Safety and Responsibility

Single source of supply results in total responsibility by one supplier, including design liability. PEB manufacturers can be relied upon to service their buildings, long after they are supplied, o protect \ their reputation.

Performance

All components have been specified and designed specially to act together as a system for maximum efficiency precise fit and peak performance in the field.

Experience with similar buildings, in actual field conditions worldwide, has resulted in design improvements over time, which allow dependable prediction of performance.

Company Details

Established in 2007, Glair Infrastructure Limited has made a name for itself in the list of top service providers of Portable Cabins in India. Glair Infrastructure Limited is listed in Trade India's list of verified companies offering a wide array of Commercial Pre-Fabricated Structures, Commercial Steel Structures, PEB, etc. Contact here for Portable Cabins in Ghaziabad, Uttar Pradesh.

Business Type

Manufacturer, Service Provider, Supplier

Establishment

2007

Working Days

To

GST NO

09AAECG2308Q1ZA

Related Products

Explore Related Categories

More Products From This Seller

Seller Details

GST

GST - 09AAECG2308Q1ZA

5 RatingRating

Ghaziabad, Uttar Pradesh

Seller Inquiry

Accepts only Domestic inquiries

Director

Mr. Vipin Kapoor

Address

UM-CSA-109, Ansal Plaza Mall, Vaishali, Ghaziabad, Uttar Pradesh, 201010, India

pre engineered building in Ghaziabad

Report incorrect details

Compare With Similar Products

Buyer Feedback

5

4

4

Minimum Order Quantity

100 Square Meter/Square Meters

1000 Square Foot/Square Foots

Payment Terms

Others, Cash in Advance (CID), Cheque

Cash in Advance (CID), Cheque, Telegraphic Transfer (T/T)

Supply Ability

400-500 Per Day

2 Per Week

Delivery Time

8-10 Days

15 Days

Sample Policy

Free samples available with shipping and taxes paid by the buyer

Contact us for information regarding our sample policy

Main Domestic Market

All India

All India

People Also Viewed