
Up-upgradation
Price:
Get Latest Price
In Stock
Product Specifications
| Automation Level | Semi/Full |
| BOD Reduction | 85%+ |
| COD Removal | 90%+ |
| Capacity Range | Variable |
| Compliance | MPCB |
| Features | Increased flow, Higher load, Odour free, Water recycling, Consultancy, Automation |
| Primary Color | Black |
| Product Type | ETP Upgrade |
| Usage | Existing ETP/STP capacity enhancement for increased effluent flow and load. |
Product Overview
Key Features
Up-Upgradation
Up-Upgradation of the ETP / STP is required when there is an increase in the flow of effluent in M3 and increase in load in terms of COD, BOD I mg / lit.
It normally happens because of the expansion in the industry, resulting in increase of effluent load. And because of this expansion, man power also increases, thus increasing the domestic waste water that is sewage.
We can up-grade existing projects by utilizing the same equipment and civil unit by doing some modification and addition, as per requirements to be capable of taking incremental load.
- Odour free outlet water quality.
- Recycling can be achieved of Treated water having much lesser parameters than MPCB's prescribed limits.
Company Details
Business Type
Exporter, Manufacturer, Service Provider, Supplier
Employee Count
100
Establishment
2007
Working Days
To
Certification
ISO 9001:2008
Related Products
More Products From This Seller
Seller Details
Pimpri, Maharashtra
Director
Mr. Harish D. Neknarayan
Address
Survey No-33-B, ION 7, 4th floor, Opposite sterling Honda Mumbai Pune highway, Pimpri, Maharashtra, 411018, India
Water Treatment Plants in Pimpri
Report incorrect details




















