voice search
Triple Compression Scrap Baling Press - 300x400x1125 Mm, 400x500x1125 Mm, 500x500x1125 Mm Bale Size , Durable Metal Scrap Compressing Solution

Triple Compression Scrap Baling Press - 300x400x1125 Mm, 400x500x1125 Mm, 500x500x1125 Mm Bale Size , Durable Metal Scrap Compressing Solution

Get Latest Price

In Stock

In Stock

Product Specifications

Bale Size300X400X100-150 Mm
Bale Weight20-35 Kgs
Baling Chamber300X400X1125 Mm
DimensionsVariable
FeaturesTriple Compression, High Efficiency, Durable Design, Versatile Use, Reliable Performance, Easy Operation, Cost Effective, Rugged Construction
MaterialSteel
Power15 Hp
WeightVariable

Product Overview

Key Features

Our organization bring for our clients a very comprehensive range of Triple Compression Scrap Baling Press. These machines have the versatility of compressing varied range of metal scrap material. Our Triple Compression Scrap Baling Press is in great demand for rugged construction, range is durable,, convenient operations and reliable in performance. The main usage of these presses is to bale the materials like M.S, Copper, Aluminum, S.S. etc. We offer the range in a variety of specifications.

Technical Specifications:
Baling Chamber (WxhxL) (mm)--300x400x1125, 400x500x1125, 500x500x1125
Bale Size (mm).--300x400x100-150, 400x300x150-200, 250x250x200-250
Bale Weight (MS)(Kgs Approx.--20-35, 30-50, 40-60
Power HP (3 Phase 1440rpm)a 15, 15, 25

Clients can avail this Triple Compression Scrap Baling Press at industry leading prices from us.

Company Details

Established in 2006, S J S Hydraulics has made a name for itself in the list of top suppliers of Industrial Machinery & Parts in India. The supplier company is located in Coimbatore, Tamil Nadu, and is one of the leading sellers of listed products.
S J S Hydraulics is listed in Trade India's list of verified sellers offering supreme quality of Coir Pith Block Making Machine..., Coir Pith Briquette Machine.., Cotton Baling Press, etc. Buy Industrial Machinery & Parts in bulk from us for the best quality products and service.

Business Type

Manufacturer, Supplier, Trading Company

Establishment

2006

Working Days

To

Related Products

Explore Related Categories

More Products From This Seller

Seller Details

Coimbatore, Tamil Nadu

Managing Partner

Mr Sasi Kumar Joseph

Address

126-B, Trinity Nagar, Near Presentation Matric Hr. Sec. School, Madukkarai Main Road, SIDCO Post Coimbatore, Tamil Nadu, 641021, India

scrap baling press in Coimbatore

Report incorrect details

Compare With Similar Products

Buyer Feedback

4

Price Or Price Range

1150000 INR (Approx.)

950000.0 INR (Approx.)

Minimum Order Quantity

1 Piece/Pieces

1 Unit/Units

Color

Blue

as per requirement

Size

All

as per requirement

Payment Terms

Cash Advance (CA), Cash in Advance (CID), Others

Cash in Advance (CID)

Supply Ability

10 Per Month

10 Per Month

Delivery Time

1 Week

2 Week

Sample Available

No

No

Sample Policy

, Contact us for information regarding our sample policy

Sample costs shipping and taxes has to be paid by the buyer

Packaging Details

Packed In As per Industry Standard

Terms and ConditionsDelivery Within 15 Days from the date of receipt your confirmation order copy duly signed and stamped along with advance payment. Terms of Payments 50% as advance along with the order & balance 50% against Performa invoice prior to dispatch along with forms. Taxes & Duties extraAll the Govt. / Local Taxes and duties shall be charged extra at the prevailing rate at the time of dispatch. However present rates of taxes are as follows: IGST: IGST 18% HSSN CODE: - 8462 Forwarding Charges Prices are based on the cost of material, component, labour and statutory obligations ruling at the date of tender or contact and may be revised and varied by JHP should these price increase. Such increase may be based by JHP on the market price of raw materials and components. Unless otherwise agreed prices are strictly ex-JHP Works and do not include the cost of packing, carriage, freight and insurance which will be charged to or paid by the Buyer. If amicably decided then the Company will arrange for packing of the goods on behalf of the Buyer at an extra charge of @ 10% Inspection Inspection can be carried out at our works prior to dispatch if so desired by you. Dispatch All the Company s goods are forwarded at the Buyer s own risk. In case of goods for export or goods sold delivery ex the Company s Works the Company cannot accept responsibility for damage or delay during transit unless it has specifically agreed in writing to cover such risk by insurance Performance, Weight, Measurement and Power Although carefully computed, must be considered approximate only and are not guarantee. Force Majure If either party is delayed or hindered in or prevented from performing any of its obligations under the Agreement by reason of act of God, fire, flood, accident, explosion, breakdown or failure of plant or machinery, war, riot, civil disturbance, strike, labour dispute, acts, orders, or regulations of Government failure (whether partial or total) of or shortage in any of the Company s or its suppliers existing or contemplated sources of material (including parts & components) or fuel or labour or transport whether such failure or shortage be existing or apprehended by the Company, failure of any supplier or sub-contractor with the Company or by reason of any cause whether or not of the same nature as the foregoing beyond its control, it shall be under no liability to the other in respect of non-performance of such obligation but the time for performing the same shall be extended until the operation of causes preventing, hindering or delaying the performance thereof has ceased.Warranty The offered equipment shall be guaranteed for a period of 12 months from the date of its dispatch against and manufacturing defect only. However, warranty does not cover against misuse, mishandling, improper maintence rubber & electrical parts and brought out items.Special Note Once order is placed the buyer cannot be cancel the order, if cancellation is done no refund of Advance payment would be claimed from seller at any cost.Arbitration1. All disputes or differences arising in future between the parties relating to this quotation shall be referred for arbitration in accordance with the provisions of the arbitration and conciliation act, 1996 based at Alwar, Rajasthan. The award made in pursuance to that shall be binding on both the parties. The sales against this quotation shall be continued during arbitration proceedings unless it is reasoned that the sales cannot possibly be continued till the matter is finally decided by the appointed arbitrators, no payment due to the company shall be withheld on account of such arbitration proceedings, unless it is the subject matter or one of the subject matters thereof, The supplier shall not pay any interest, damages (including liquidated risk purchase) etc. for non-delivery of material for the reasons beyond its control. 2. Appointment of ArbitratorEach party shall appoint one (1) arbitrator and these two (2) arbitrators shall jointly agree on and appoint the third arbitrator. If the two (2) arbitrators appointed cannot agree on a third arbitrator, the third arbitrator shall be appointed in accordance with the provisions of the arbitrations and conciliation Act, 1996 and any amendment/thereof.3. The Language of arbitration shall be English only. 4. Binding and Liability.The award pass by the arbitrator(s) shall be binding and the sole and exclusive remedy between the parties regarding any dispute and all claims or counterclaims for the parties, their successors and assign and each shall comply in good faith with any and all rulings of the arbitrators.Installation & Commissioning 1. Exaction of the machine cable laying & termination to be done by the customers as per our specification. 2. Installation, commissioning & servicing under warranty period is free of cost only you have to bear to&Fro AC Train fare along with loading & boarding. 3. After warranty the charges of the engineer is 5000/- per day (A day is considered to be a 8 hours working hour) plus To &Fro AC Train fare with loading & boarding. 4. In case of Export all the expenses (Visa, Air Ticket, Hotel, and Local Fare Ec.) will be charge extra. Validity of the offer 30 days from the date of dispatch.All disputes subject to only Alwar Jurisdiction. [NOTE: ANY OTHER CLAUSE, WHICH IS NOT MENTIONED IN OUR OFFER, SHALL NOT BE BINDING ON US UNLESS AGREED BY US IN WRITING.] Thanking you, & awaiting your valued order. Yours faithfully For Jindal Hydro Projects Inc. Rakesh Gupta +91-986817694

Main Domestic Market

All India

All India

People Also Viewed