
Metal Pp Clamps For Pcb Plating
Price: 40 USD
Get Latest Price
Minimum Order Quantity :
20
In Stock
Product Specifications
| Metal Type | Stainless Steel |
| Material | Metal |
| Structure | Spring Clamp |
| Standard | ISO9001 |
| FOB Port | HUANGPU |
| Payment Terms | Telegraphic Transfer (T/T), Western Union, Paypal, Cash in Advance (CID) |
| Supply Ability | 30000 Per Month |
| Delivery Time | 10 Days |
| Sample Available | Yes |
| Sample Policy | Contact us for information regarding our sample policy |
| Packaging Details | PAPER CARTON |
| Main Export Market(s) | Australia, South America, Middle East, Western Europe, Central America, Asia, Eastern Europe, North America |
| Main Domestic Market | All India |
| Certifications | ISO9001 |
Product Overview
Key Features
CLAMPS
Line Type: Automatic Plating Lines
Used for: Electrolytic processes
Contact: Stainless Steel
Coating: Clamp tips coated with Polypropylene
Our top loading Clamps are ideal for Automatic electroplating lines.
In general, clamps are installed on the flight bar and remain fixed in position for an extended period of time. These are not recommended for users who plan to remove the racks from the flight bar in between each cycle.
Once the clamps are installed, the operator simply lifts the panel into place and tightens the clamp shut (different tightening methods possible)
Advantages:
* Quick loading times, means operators spend less time racking the panels in place
* Panels loaded from the top means more room for panels in the plating tank. Longer vertical racks such as our Copper Core racks need 2 inches in between each panel to fit the rack in.
* Reduced wear to rack since only the tip of the rack is submerged in chemical solutions
* Easy, in-house maintenance possible
Company Details
Business Type
Exporter, Manufacturer, Distributor, Supplier, Trading Company
Employee Count
63
Establishment
2016
Working Days
Monday To Friday
Payment Mode
Telegraphic Transfer (T/T)
Related Products
Explore Related Categories
More Product From This seller
Seller Details
Guangzhou, Guangdong
Sales Manager
Mrs Cherry Li
Members since
8 Years
Address
Room 101 Of Building 8, West 3 Street Of Zhuzhai New District Xiaolong Village, Shiji Town, Panyu, Guangzhou, Guangdong, 511450, China
pp clamps in Guangzhou
Report incorrect details










































