
Lightning Surge Protector (Ly1-b60)
Price:
Get Latest Price
In Stock
Product Specifications
FOB Port | NINGBO |
Payment Terms | Cash on Delivery (COD), Letter of Credit (L/C), Paypal, Others, Western Union, Letter of Credit at Sight (Sight L/C), Delivery Point (DP), Cash Against Delivery (CAD), Telegraphic Transfer (T/T), Days after Acceptance (DA), Cash in Advance (CID), Cheque, Cash Advance (CA) |
Supply Ability | 9999 Per Month |
Delivery Time | 10 Days |
Sample Available | Yes |
Sample Policy | Sample costs shipping and taxes has to be paid by the buyer |
Packaging Details | aEURC/ Voltage relay is standard seaworthy package,aEURC/ 1pcs individual box or 5pcs in a middle box,aEURC/ 100pcs per carton.aEURC/ Base quotation is blank package.aEURC/ OEM design is acceptable.aEURC/ Delivery Time 1-30days, according to order quantity. |
Main Export Market(s) | Australia, South America, Eastern Europe, Middle East, Western Europe, Africa, Asia, Central America, North America |
Certifications | aEURC/ CE aEURC/ rohs |
Product Overview
Key Features
Product Parameters
Model : LY1-B60
Uc : 420V DC
In : 30kA
Imax : 60kA
Up : a 2.4kV
Poles : 4P
Installation : 35mm Din rail installation
Fuse or switch matched : 32A
Response time : <25ns
Dimension : 70.4*50.5*91mm
Product Details
60kA Surge Protection (Surge Protection Device) is suitable for TN-S,TN-C-S,TT,IT etc. power supply system of AC 50/60Hz, <380V, installed on the joint of LPZ1 or LPZ2 and LPZ3, its designed according to IEC61643-1, GB18802.1, it adopts 35mm standard rail, there is a failure release mounted on the module of surge protection device.
When the SPD fails in breakdown for over-heat and over-current, the failure release will help electric equipments separate from the power supply system and give the indication signal, green means normal, red means abnormal, its also could be replaced for the module when has operating voltage.
Product features:
1. Inside over-current and over-heat protection, temperature control open circuit.
2. Module design, convenient installation, could be replaced online.
3. Smallness leak current, response quickly, less residual voltage.
4. gnal indication device, green(normal), red(abnormal).
5. Technology, highly energy, clearance discharge pole(N-PE)
6. Response time less than 25ns
7. Max could endure 60KA lightning
Installation position
Installed on the joint of LPZ1,LPZ2 and LPZ3, usually installed in household distribution board, computer equipment, information equipment, electronic equipment and in the socket box in front of control equipment or near the control equipment.
Company Details
Business Type
Manufacturer
Employee Count
50
Establishment
2010
Working Days
Monday To Sunday
Payment Mode
Telegraphic Transfer (T/T)
Related Products
Explore Related Categories
Seller Details
Zhejiang, Zhejiang
Mr Wanjinlong
Address
Hangzhou Bay New Zone of Ningbo Zhejiang, Zhejiang, 315300, China
Report incorrect details