We are highly celebrated manufacturer and supplier of Redoxide Metal Primer in Hyderabad, Telangana, India.
COVERAGE
150 â 170 sq. ft/ltr/coat, when applied on smooth non-absorbent surfaces.
DRYING TIME
Surface Dry: Max 1 hr
(@27° ± 2°C & RH 60 ± 5%)
GLOSS LEVELS / SHEEN LEVELS
Matt
RECOATING
Min 8 hrs
Stoving: 30minutes at 120°C
FLASH POINT
Not below 30°C
THINNING
Upto 30% by volume using IMPERIAL General Purpose Thinner
Image
STABILITY OF THINNED PAINT
Use within 24 hrs.
Last updated on : 06 October 2017